manufacturing resource planning (MRP-II)

Popular Terms
Successor to the material requirements planning (MRP), it integrates planning of all aspects (not just production) of a manufacturing firm. MRP-II includes functions such as business planning, production planning and scheduling, capacity requirement planning, job costing, financial management and forecasting, order processing, shop floor control, time and attendance, performance measurement, and sales and operations planning. See also optimized production technology.


Email Print Embed

<button id="yvPRVNP"><small id="yvPRVNP"></small></button>
<button id="yvPRVNP"><small id="yvPRVNP"></small></button>
<button id="yvPRVNP"><small id="yvPRVNP"></small></button>
<button id="yvPRVNP"></button>
<button id="yvPRVNP"></button>
<kbd id="yvPRVNP"></kbd>
<s id="yvPRVNP"><big id="yvPRVNP"><cite id="yvPRVNP"></cite></big></s>
<s id="yvPRVNP"><big id="yvPRVNP"></big></s>
  • 5215568 2018-01-19
  • 512120567 2018-01-19
  • 314858566 2018-01-19
  • 11778565 2018-01-19
  • 702126564 2018-01-19
  • 715729563 2018-01-19
  • 569692562 2018-01-19
  • 295282561 2018-01-19
  • 991485560 2018-01-19
  • 230200559 2018-01-18
  • 10324558 2018-01-18
  • 825271557 2018-01-18
  • 228878556 2018-01-18
  • 178173555 2018-01-18
  • 763686554 2018-01-18
  • 528228553 2018-01-18
  • 817608552 2018-01-17
  • 816246551 2018-01-17
  • 380838550 2018-01-17
  • 181567549 2018-01-17